petroleum product
Would you like to react to this message? Create an account in a few clicks or log in to continue.

Offer sugar IC 45 CIF

Go down

Offer sugar IC 45 CIF  Empty Offer sugar IC 45 CIF

Post  Admin Sun Nov 18, 2012 11:17 pm

Offer sugar IC 45 CIF

1/ buyer Egypt ## we need finale contract for 12500mt IC 45 monthly to Egypt,, our bank http://www.theubeg.com/wps/portal/enub ##

SOFT OFFER

max 300.000 MT per months

REFINED CANE SUGAR ICUMSA 45
NOVEMBER 2012

Offer sugar IC 45 CIF  54151110

SUGAR IN CONTAINERS
CIF ASWP
500mt – USD 750.00mt
1000mt – USD 740.00mt
1500mt – USD 730.00mt
2500mt – USD 725.00mt
3500mt – USD 710.00mt
4500mt – USD 700.00mt
"


PACKING
In 50 Kilo bags with Polythene Inner

DESTINATION & DELIVERY
Destination: CIF ASWP

SHIPMENT
Minimum Shipment 12,500 MTS in 30-45 Days and Rest in 30 Days and after Receipt of Payment Instrument to the Seller’s Bank.

PERFORMANCE BOND
The Seller will Post 2% Performance Bond after Receipt of Payment Instrument.

INSPECTION
S.G.S Inspection for Quality and Quantity Service at Seller’s Cost at loading place

PAYMENT
Spots-Irrevocable, Transferable, Confirmed DLC for total quantity 100% payment at sight from Top Western Prime Bank.
Annual Contracts: Payments by 2 shipments SBLC/BG + 10 months ARDLC


REFINED SUGAR ICUMSA-45
POLARIZATION: 99.80 Degrees min.
ASH CONTENT: 0.04 Max.
ICUMSA: 45 RBU
SOLUBILITY: 100% Dry and Free Flowing
COLOR: Sparkling White. Maximum 45 Icumsa attenuation index units
RADIATION: Within internationally accepted limits.
GRANULATION: Fine to Medium
MOISTURE: 0.4% Max.
MAGNETIC PARTICLES: 4Mp/k
SO2: 70 Mg/k
ASH BY ELECTRICAL CONDUCTIVITY: 0.04% Max. [on dry weight basis]
SULPHUR DIOXIDE: 20 mg/kg Min.
SEDIMENTS: None.
SMELL: Free of any Smell
REDUCING SUGAR: 0.05% Max. by weight.
HPN STAPH AUREUS: Nil.
MAX AS: 1 P.P.M.
MAX PS: 2 P.P.M.
MAX CU: 3 P.P.M.
SUBSTANCE: Solid Crystal


PROCEDURES
1) Buyer issues a LOI + RWA/BCL + NCND
2) Seller or Seller Mandate issues FCO
3) Buyer sign seal and return the FCO
4) Seller issues Draft Contract
5) Buyer sign, seal and return the Contract, seller sign the Contract and return to the Buyer
6) Within 3 (three) banking days, Buyer Bank sends a Non- operative DLC/ARDLC for total
shipment value to the seller’s Bank
7) Within 5 (Five) banking days, Seller’s Bank sends Proof of Products (POP) + PB 2% via Swift
Bank to Bank methods to the Buyer’s Bank and Activate the Payment Instrument.
8 / DLC/ARDLC Becomes operative.
9) Shipment Starts.


Please Note These prices may be subject to change without notice
The market prices for commodities and products commercialized by SELLER are subject to change without notice.

We look forward to doing future business with you.

Offer sugar IC 45 CIF  Thank_19
Admin
Admin
Admin

Posts : 647
Join date : 2012-10-23

http://about.me/rudolfsindelar

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum